I cannot seem to post pictures.
We have to roof and 2 side quarters cut out and new ones tacked in place. The right side is just about completely welded in. Stitch welding takes time.
The areas that I'm replacing really wouldn't accept the panel Bond very well. Being a T-top sub frame car, I opted to weld. We will however use panel Bond in the floor boards.